Exterior Construction Project Documentation Services
Multivista initiated photographic progress documentation of the structure in Fall 2009 with the Site Survey Exact-Built® photo shoot of all pre-existing conditions near the project site. In Spring 2010, Multivista began documenting the Exterior Progression of the site, as well as Bridge Deck Pre-Slab Exact-Built® conditions. As construction progressed, Multivista was onsite to capture other bridge-specific shoots including the East and West Abutments, Pile Caps, Pier Pods, Footings Exact-Built®, Bridge and Railroad Decks, and Sand Filters. Multivista performed Monthly Progression Documentation, as well as Slideshow Documentation.