Building Safety Act Compliance: Maintaining the “Golden Thread”

Back to Corporate Blogs

In response to the tragic Grenfell Tower fire in 2017, the UK government introduced the Building Safety Act to enhance safety standards and ensure the well-being of building occupants. It became law in 2022.

One key aspect of this legislation is the concept of the “Golden Thread.” Coined by Dame Judith Hackitt in her post-Grenfell industry report, the Golden Thread principles stress the need for a continuous and transparent flow of safety information throughout a building’s lifecycle. Despite significant strides, Dame Hackitt has since expressed frustration at the industry’s slow response and lack of cohesion in fully embracing these new regulations.

The Building Safety Act 2022 imposes significant obligations on building owners and developers to maintain detailed safety information throughout the building lifecycle, and provide documentation at three critical “Gateway” points in a project: planning application, pre-construction, and completion.

The Golden Thread principles emphasise the need for accurate and up-to-date information as well as transparency and accountability. This means UK building owners and developers will need to ensure that safety data is consistently updated, accessible, and provide all stakeholders with a clear record of safety measures and construction practices.

Building Safety Act Challenges

Implementing the Building Safety Act 2022’s Golden Thread principles presents many challenges for building owners and developers. 

First, it requires extensive documentation, spanning from design to completion, as detailed records need to be maintained for every aspect of construction. Compliance with Gateway points adds another layer of complexity, with mandatory safety checks at various project stages.

Ensuring that project data is consistent, accurate, and accessible to all stakeholders is another considerable hurdle. Existing buildings often lack complete data records (or only have paper-based records), making it difficult to construct a comprehensive Golden Thread.

The construction industry also faces the challenge of data silos. With so many stakeholders involved in each project — owners, developers, main contractors, architects, individual tradespeople, facilities managers, and more — essential information can be hard to incorporate into a unified system. This also makes it difficult to maintain information flow between building lifecycle stages, especially between construction and operation.

Ultimately, navigating these challenges necessitates a significant amount of time and focus, a problem exasperated by the industry’s busy pace and an ongoing shortage of skilled labour.

How Multivista Supports the Golden Thread Principles

By partnering with Multivista, construction owners, developers, and contractors can successfully implement Golden Thread principles with greater efficiency, benefiting from:

  • Complete Documentation Services and AI Analysis: We offer a wide breadth of construction reality capture solutions, including high-resolution 2D and 360-degree photo documentation, video documentation, and UAV/drone capture. Visual project data can be integrated with AI analysis software powered by Hexagon for seamless project management, including Firestopping compliance. By leveraging a mix of solutions that’s right for your organisation, you can achieve efficient and accurate remote monitoring at every project stage — which is crucial for maintaining the Golden Thread and providing required documentation at all Gateway points. 

 

  • Improved Efficiency: Multivista manages all documentation tasks, allowing your team to maintain efficiency in your core tasks. Additionally, the Multivista cloud-based platform enables seamless project coordination and data sharing among stakeholders, improving efficiency by ensuring everyone involved has access to the latest information.

 

  • Independent and Unbiased Documentation: Our extensively trained documentation specialists are highly skilled in capturing your site’s as-built conditions, so you can achieve better project transparency and integrity in your compliance records. This is crucial for adhering to the Golden Thread principles, which demand clear and unbiased records of all safety measures.

 

  • A Comprehensive, Single Source of Truth: Our cloud-based platform maintains an organised archive of all reality capture data. All documentation data is date-stamped and mapped to digital floor plans and integrates seamlessly with existing tech stacks — so it’s accessible on any device with an internet connection. This single source of truth ensures centralised, accurate documentation for compliance reviews and seamless stakeholder coordination, minimising the risk of discrepancies or missing information.

 

  • Proven Expertise: Since 2003, Multivista has documented over 10 billion square feet of construction projects. Our documentation and quality assurance processes are supported by proven methodologies that have been perfected through millions of hours of documentation work — so you know you’re getting the best possible reality capture data to support your compliance efforts.

 

Navigate Compliance with Confidence

The Building Safety Act 2022 and the associated Golden Thread principles represent a significant paradigm shift in building safety, raising the bar for meticulous documentation and information transparency. 

Navigating these changes can be a daunting task, but a trusted partner like Multivista can help you adjust your documentation processes to aid compliance efforts. With comprehensive documentation and AI-powered solutions, specialised expertise, and a single-source-of-truth cloud-based platform, we’re here to help you navigate this complex regulatory landscape more efficiently.

Ready to forge an easier path to compliance? Contact us today to learn how we can help you.

 