Project Profile – Mercedes-Benz Stadium/FIFA Pre-World Cup As-Builts | Multivista

PROJECT PROFILE

Mercedes-Benz Stadium/FIFA Pre-World Cup As-Builts

Project
Description:

Originally built in 2017 in Atlanta Georgia, the Mercedes-Benz Stadium/FIFA required updated as-builts prior to FIFA World Cup 26 which is scheduled to take place from June 11 – July 19, 2026.

projects location

1 AMB Dr NW, Atlanta, Georgia, 30313, United States

Client

AMB Group LLC
(Atlanta, Georgia)

Industry

Recreation, Athletic Facility

Project Size

1,352,924 sqft

Project Requirements:

The Mercedes-Benz Stadium/FIFA required updated as-builts because they lacked proper plans for the building. Therefore, they contracted Multivista for 3D Laser Scans to create new existing conditions for the 2026 FIFA World Cup. Multivista is continuing to provide Laser Scanning services for additional spaces in the stadium as required.

Multivista Deliverables:

CAD drawings, Scan to Services, 3D Point Clouds

Figure 1:
Mercedes-Benz Club CAD Drawing
Figure 2:
Field Level Site Walk
Figure 3:
Retractable Roof Site Walk
Figure 4:
Delta Sky360 Club Bar Point Cloud
Figure 1:
Mercedes-Benz Club CAD Drawing
Figure 2:
Field Level Site Walk
Figure 3:
Retractable Roof Site Walk
Figure 4:
Delta Sky360 Club Bar Point Cloud

Start your project
with us

To learn more about how Multivista can benefit your project, please fill out the form below, and someone from our team will be in touch with you shortly.