MEP Exact-Built®

Mechanical, electrical, plumbing (MEP) and all other systems in walls and ceilings are photographed post-inspection and pre-insulation, sheet rock or dry wall installation.

MEP Exact-Built® Photo Shoots

Mechanical, Electrical, Plumbing (MEP) and all other systems in walls and ceilings will be documented post-inspection and pre-insulation, sheet rock or dry wall installation. This process provides a high concentration of overlapping coverage allowing for all finished systems to be viewed in great detail.

This Exact-Built® sweeps the entire project: every wall and every ceiling, on every floor of every building, throughout the entire Project. Note that this will not capture pre-slab, site, or in-slab-on-deck systems or other “horizontal” MEP work.

Most facility managers tell us their as-built drawings are inaccurate, not available at the time of building start-up, or missing completely. Having your facilities and operations & maintenance team work blindly could be an extremely expensive situation for you. We have had clients hit critical systems in their walls, floors and ceilings because of inaccurate as-builts that have caused hundreds of thousands of dollars in damages. This could be prevented by having x-ray vision behind all of your walls, floors and ceilings.

MEP Construction Photo Documentation Services

Multivista photographically documents every square foot of your walls, floors and ceilings just prior to them being covered up. These shoots are typically done in conjunction with your in-wall inspections and then the photographs are linked directly to your floor plans.

When doing a renovation, contractors typically add at least a 5% premium to protect themselves against any unforeseen conditions. You the owner are paying this premium. Multivista’s Exact-Built® system virtually eliminates all of these unforeseen conditions, which will most likely save you between 2-5% on all future renovations.