Case Study: C.D.O.T. – Cherryvale Bridge Documentation

Download this document as a PDF

Colorado Department of Transportation (CDOT):
Cherryvale Bridge Documentation

Multivista: CDOT - Cherryvale Bridge - Lower Deck

The Cherryvale Bridge project replaces the original bridge, built in 1951, with a new $2.7 million structure.

Multivista initiated progress documentation of the structure on April 2nd, and performed a comprehensive Pre-Slab Exact Built™ of the deck steel on April 7th, just prior to the concrete being poured.

Over 600 high resolution images were captured and are linked to the architectural drawings that were provided.