Multivista serves a purpose for everyone (Project Managers, Contractors, Developers and Architects; to Investors, Lenders, Insurance carriers, Attorneys and Risk Management professionals) and Multivista’s extraordinary coverage will begin to save your team time and money from Day One!

Consider the following examples in which Multivista’s Exact Built™ System was not only cost effective, but put the responsibility where it belonged.

In Phoenix: “General Contractor Saves Big!”

The city sent the GC a $96K bill for damage done to the project’s surrounding streets and sidewalks. Using our photographic Pre-construction Site Survey, the Owner and GC were able to exonerate themselves within 24 hours, demonstrating conclusively that the conditions identified by the City were pre-existing.

In Atlanta: “General Contractor v. Subcontractor”

A project included over 200 residential Units; After drywall was 90% complete, it was discovered that the washer/dryer hook-ups in every Unit were installed improperly. The plumbing sub-contractor claimed that “congested conditions in the walls required an impromptu work-around and rejected the costs of correcting the installations”. The GC immediately pulled up the Interior MEP Exact-Built™, which captured the plumbing systems just before insulation. The same day the problem was discovered, and without any destructive testing, the GC was able to show conclusively in EVERY Unit that the conflict complained of by the plumbing sub-contractor did not exist. The cost of correction, over $20,000, fell where it belonged, on the sub-contractor.

In Nashville: “Walking The Site Remotely Resolves Warranty Issues”

A large project was owned and designed by an out-of-state team, with one principal out-of-country owner. Utilizing the exterior and interior progressions, the team was able to conduct regular, comprehensive OAC meetings remotely, walking the site and responding to RFI’s and conflicts without leaving their desk. The estimated savings in travel costs alone were over $50K for the life of the project. Thereafter, on that same job, the PM further reported countless savings by being able to readily combat claims of voided warranties with the Multivista system.

In Vancouver: “The Case Of The Stolen Copper”

An insurance company tried to deny an expensive claim for massive amounts of copper piping stolen after the GC had installed it. The Owner, frustrated, made clear that if the claim failed, the GC would have to bear the cost. Utilizing progressions and the interior exact-built™, the GC was able to provide conclusive evidence of the copper pipe’s installation and therefore validate the insurance claim.

In Chicago: “Time = Money”

A large retail mixed-use client estimated one day of delay to cost them $12,000. On major change orders, they reported they would often lose 1-2 days awaiting feedback from the GC, architect, and sub-contractors. They estimated the remote access of Multivista and the detailed level of coverage would save them several weeks worth of such delay over the life of the project – putting the savings for this application alone, well over a hundred thousand dollars!

See what our clients are saying…

Download our ROI Examples PDF here.

To receive more stories and news regarding the Multivista Exact-Built™ system and our construction photo documentation, subscribe to our RSS feed and/or sign-up for our eNewsletter here.

CONTACT US

COMPANIES UTILIZING MULTIVISTA